
In the video, Workers prepare gravel filters at the bottom of a completed concrete well.
Water seeps from gaps between the lowest pipe section and the bedrock.
Safety ropes secure the crew as they level the base and manage drainage.
A plastic tube drains seepage to keep the worksite dry for construction.
This shows critical steps in building large-diameter wells for groundwater access.
Such wells are commonly used in rural irrigation systems.