
They had to span the McCloy Creek and had great difficulty pounding pilings into a solid base with the steam powered pile drivers. Some piles are believed to go down more than 25 metres.
By fall of that year, the longest wooden train trestle in Saskatchewan was 406 metres long and 15 metres high and ready for train traffic.