Today we have the large wall install with windows and doors on the biggest building we've ever built. As fast as the other two large walls went, this third wall is full of details. Those details include window framing and install, door framing and install, as well as metal trim details.
Buckle up it's a long one with lots of great info!
Sashco Free Sample Pack
RR Plans
M12 Nibbler
Midwest Snips
Pica Pencil (Green Pencil I use)