
In this clip, a loader exits a mountain spillway tunnel after completing sediment cleaning. Shallow water remains on the concrete floor post-maintenance. The machine has removed flood debris to ensure smooth water flow. This routine work prepares the tunnel for rainy season. All operations meet hydraulic engineering standards.