
One major connection flashing detail that I think is important, is how the peak is flashed into a sidewall. I show that as well as how the new building wraps around the soffit of the old building. It was tricky connecting metal trim details to an existing wooden fascia, but I am happy with how it turned out.
Let me know down below in the comments if you liked the way we handled the connection flashing, or if there are better ways to handle the metal trim details.
Diablo Supports RR Buildings and I would Appreciate you supporting them. Below is a link to the Recip Blades I was talking about.
Nail-Embedded Wood Blade: www.diablotools.com/recip/nail-embedded-wood?bram=rrb
Buy Here
Diablo Nail embedded wood Amazon Affiliate Link
Milwaukee Recip Saw
If you'd like to support me, below are various ways to help!
Shirts:
Hats:
patreon:
Instagram:
Check out the latest episode of the If You Build it Podcast with @Mikeythemaker and myself!!
iTunes :
Spotify :