Upgrading Airport Landing System - New Glide Path installation

Просмотров: 97, 986   |   Загружено: 6 дн
icon
M. Bjoernstroem
icon
7, 567
icon
Скачать
iconПодробнее о видео
*English subtitle available*

00:00 – Intro Clip - Coming Scen
00:09 – Dismantling the Glide Path Mast with a Crane
02:07 – Excavating Foundation for the Near Field Mast
03:10 – Why the Old Glide Path System Is Being Replaced
04:07 – Removing Old Foundation for Near Field Monitor with Excavator and Wheel Loader
06:28 – Digging Cable Trench for New Coaxial Cable
09:44 – Timelapse: Installing New Antennas on Glide Path Mast
10:04 – Lifting Mast with New Antennas Using a Crane
11:30 – Preparing Ground Hole for Near Field Monitor Foundation Installation
20:28 – Rainy Weather on Site
20:34 – Installing New Antenna for Near Field Monitor
22:00 – Backfilling Hole with Volvo L110H Loader
23:22 – Saab Technicians Installing New Equipment in Glide Path Shelter
23:41 – Refueling Plane with JETA1 for Flight Testing New Glide Path Instrument
24:57 – Flight Testing the New Glide Path System
26:43 – Backfilling Moved Foundation with Drainage Material
33:35 – Insulating Foundation Against Ground Frost (Slightly Overkill)
38:23 – Final Touches: Raking the Ground
38:41 – Flying with Local Aircraft to Luleå to Test Glide Path Instrument in beech 200 Plane

Похожие видео

Добавлено: 55 год.
Добавил:
  © 2019-2021
  Upgrading Airport Landing System - New Glide Path installation - RusLar.Me