The Presidency insists that progress is being made to implement the plan outlined by President Cyril Ramaphosa on July 25 to tackle load-shedding, which breached 4 100 GWh by the end of September – a level that is materially worse than the 1 776 GWh shed in 2021, the country’s previous worst load-shedding year.
Full article: