Rebuilding a Deck Part 2 - Securing and Leveling Framing Structure
- Видео
- О видео
- Скачать
- Поделиться
Rebuilding a Deck Part 2 - Securing and Leveling Framing Structure
150, 957 | 5 год. назад | 1, 705 - 0
The most important part of the deck rebuilding project is making sure your framing structure is safe, secure, and level. When dealing with a deck structure make sure you understand and follow the local building code in your area. For our project the majority of the wood was still good on our deck but we had to address several issues listed below.
Issues Addressed:
1) Replace Support Post
2) Replace Damaged Joists
3) Replace all Rim Joists
4) Add Blocks Between Joists
5) Level Overall Structure
Hardware Used
Spax PowerLag:
Spax 3 1/2 Inch Screw:
DeckMate 3 Inch Deck Screw:
1 1/2 Inch Joist Hanger Nails:
Tools Every Weekend Warrior Needs
Makita Corless Drill Combo Kit:
Dewalt Drill Bit Set:
Dewalt Screwdriver Bit Set:
Craftsman Screwdriver Set:
Eklind Allen Wrench Set:
Pliers (4-Piece Set):
Stanley Utility Knife:
Stanley Tape Measure:
Studbuddy Stud Finder:
Johnson Torpedo Level:
Stanley Hammer:
Buck Bros Wood Chisel Set:
Klein Voltage Tester:
Wire Strippers:
Little Giant Ladder:
DISCLAIMER: This video and description contains affiliate links, which means that if you click on one of the product links, I’ll receive a small commission.
Чтобы скачать видео "Rebuilding a Deck Part 2 - Securing and Leveling Framing Structure" передвинте ползунок вправо
- Комментарии
Комментарии ФБ