🚧 Assembling a crawler crane is a complex process that requires proper planning, skilled personnel, and safety precautions. The process may vary depending on the crane model and manufacturer, but here’s a general step-by-step guide for assembling a crawler crane: 1. Preparation & Site Setup Check the ground conditions: Ensure the site is level and stable enough to support the crane’s weight. Inspect all crane components: Verify that all parts, including the boom, tracks, and counterweights, are in good condition. Arrange necessary equipment: Use assist cranes, forklifts, and rigging gear to help with the assembly. 2. Unloading & Positioning the Crane Base Transported crawler cranes usually arrive in parts on multiple trucks. The main body (carbody) is unloaded and positioned on firm, level ground. Outriggers or support beams may be used temporarily for stability. 3. Attaching the Crawler Tracks The tracks (crawlers) are delivered separately and need to be connected to the crane's carbody. Using an assist crane, each track is lifted and aligned with the undercarriage. Pins or bolts are secured to attach the tracks properly. Once installed, the hydraulic system is checked to ensure smooth track movement. 4. Installing the Counterweights Counterweights are critical for stability and lifting capacity. They are stacked on the rear or sides of the crane as per manufacturer specifications. Some cranes have automatic counterweight systems, while others require manual installation using an assist crane. 5. Assembling the Boom & Jib The boom sections (main boom or lattice boom) are connected one by one. The jib (if required) is attached to extend reach. Pins, bolts, and safety locks secure the boom and jib in place. Hydraulic or cable systems are checked for proper tension and function. 6. Connecting the Hoist & Wire Ropes The hoist drum and wire ropes are installed. Sheaves, pulleys, and hook blocks are properly routed. A load test is performed to ensure smooth operation. 7. Final Inspections & Testing Check for any loose connections in bolts, pins, and hydraulic lines. Conduct load testing to ensure the crane can lift safely. Operators perform functional tests for movement, lifting, and braking. Safety systems such as limit switches, alarms, and emergency stops are verified. 8. Ready for Operation Once all tests are passed, the crane is cleared for lifting operations. Regular maintenance and safety checks are recommended before and after use. Here are some relevant hashtags for your crawler crane assembly post: General Hashtags: #CrawlerCrane #CraneAssembly #HeavyEquipment #ConstructionLife #CraneOperator #ConstructionMachinery #CraneLifting Industry-Specific Hashtags: #HeavyLifting #LiftingEquipment #ConstructionEngineering #CraneSetup #Rigging #CraneInstallation Safety & Maintenance Hashtags: #SafetyFirst #ConstructionSafety #CraneMaintenance #OSHA #WorkSiteSafety
9, 292   |   1 нд. назад  |   148 - 0
 

Assembling a Crawler Crane

Скачайте изображение (превью) выбрав качество


320x180 480x360 640x480 1280x720

🚧 Assembling a crawler crane is a complex process that requires proper planning, skilled personnel, and safety precautions. The process may vary depending on the crane model and manufacturer, but here’s a general step-by-step guide for assembling a crawler crane:

1. Preparation & Site Setup
Check the ground conditions: Ensure the site is level and stable enough to support the crane’s weight.
Inspect all crane components: Verify that all parts, including the boom, tracks, and counterweights, are in good condition.
Arrange necessary equipment: Use assist cranes, forklifts, and rigging gear to help with the assembly.
2. Unloading & Positioning the Crane Base
Transported crawler cranes usually arrive in parts on multiple trucks.
The main body (carbody) is unloaded and positioned on firm, level ground.
Outriggers or support beams may be used temporarily for stability.
3. Attaching the Crawler Tracks
The tracks (crawlers) are delivered separately and need to be connected to the crane's carbody.
Using an assist crane, each track is lifted and aligned with the undercarriage.
Pins or bolts are secured to attach the tracks properly.
Once installed, the hydraulic system is checked to ensure smooth track movement.
4. Installing the Counterweights
Counterweights are critical for stability and lifting capacity.
They are stacked on the rear or sides of the crane as per manufacturer specifications.
Some cranes have automatic counterweight systems, while others require manual installation using an assist crane.
5. Assembling the Boom & Jib
The boom sections (main boom or lattice boom) are connected one by one.
The jib (if required) is attached to extend reach.
Pins, bolts, and safety locks secure the boom and jib in place.
Hydraulic or cable systems are checked for proper tension and function.
6. Connecting the Hoist & Wire Ropes
The hoist drum and wire ropes are installed.
Sheaves, pulleys, and hook blocks are properly routed.
A load test is performed to ensure smooth operation.
7. Final Inspections & Testing
Check for any loose connections in bolts, pins, and hydraulic lines.
Conduct load testing to ensure the crane can lift safely.
Operators perform functional tests for movement, lifting, and braking.
Safety systems such as limit switches, alarms, and emergency stops are verified.
8. Ready for Operation
Once all tests are passed, the crane is cleared for lifting operations. Regular maintenance and safety checks are recommended before and after use.

Here are some relevant hashtags for your crawler crane assembly post:

General Hashtags:
#CrawlerCrane #CraneAssembly #HeavyEquipment #ConstructionLife #CraneOperator #ConstructionMachinery #CraneLifting

Industry-Specific Hashtags:
#HeavyLifting #LiftingEquipment #ConstructionEngineering #CraneSetup #Rigging #CraneInstallation

Safety & Maintenance Hashtags:
#SafetyFirst #ConstructionSafety #CraneMaintenance #OSHA #WorkSiteSafety


Assembling a Crawler Crane

Чтобы скачать видео "Assembling a Crawler Crane" передвинте ползунок вправо



Покажите вашим друзьям, добавьте в соцсети

Ссылка на страницу с видео:

 

Ссылка HTML на страницу с видео:

 

Код для вставки плеера:


  • Комментарии

Комментарии ФБ


Уважаемые друзья!

Источником всего видеоконтента, в том числе проигрывающегося на страницах ресурса ruslar.me, является сторонний видео ресурс, а именно общедоступный видеохостинг YouTube.com, предоставляющий открытый доступ к своему видеоконтенту (используя открытую и общедоступную технологию video API3 youtube.com)!

Проблемы с авторскими правами

Если вам принадлежат авторские права на данное видео, которое было загружено без вашего согласия на YouTube.com, перейдите на страницу этого видео сайта YouTube.com , нажмите на ссылку под проигрывателем Ещё -> "Пожаловаться" -> "Нарушение моих прав" и в выпадающем меню, выбирите, что именно нарушается и нажмите кнопку "Отправить".



Неприемлемый контент

Чтобы сообщить о неприемлемом видео, перейдите на YouTube, нажмите на ссылку под проигрывателем Ещё -> "Пожаловаться" и выберите в "Сообщить о нарушении" что именно вас не устраивает в этом видео. Подробнее о наших правилах читайте в Условиях использования.