1. Preparation & Site Setup
Check the ground conditions: Ensure the site is level and stable enough to support the crane’s weight.
Inspect all crane components: Verify that all parts, including the boom, tracks, and counterweights, are in good condition.
Arrange necessary equipment: Use assist cranes, forklifts, and rigging gear to help with the assembly.
2. Unloading & Positioning the Crane Base
Transported crawler cranes usually arrive in parts on multiple trucks.
The main body (carbody) is unloaded and positioned on firm, level ground.
Outriggers or support beams may be used temporarily for stability.
3. Attaching the Crawler Tracks
The tracks (crawlers) are delivered separately and need to be connected to the crane's carbody.
Using an assist crane, each track is lifted and aligned with the undercarriage.
Pins or bolts are secured to attach the tracks properly.
Once installed, the hydraulic system is checked to ensure smooth track movement.
4. Installing the Counterweights
Counterweights are critical for stability and lifting capacity.
They are stacked on the rear or sides of the crane as per manufacturer specifications.
Some cranes have automatic counterweight systems, while others require manual installation using an assist crane.
5. Assembling the Boom & Jib
The boom sections (main boom or lattice boom) are connected one by one.
The jib (if required) is attached to extend reach.
Pins, bolts, and safety locks secure the boom and jib in place.
Hydraulic or cable systems are checked for proper tension and function.
6. Connecting the Hoist & Wire Ropes
The hoist drum and wire ropes are installed.
Sheaves, pulleys, and hook blocks are properly routed.
A load test is performed to ensure smooth operation.
7. Final Inspections & Testing
Check for any loose connections in bolts, pins, and hydraulic lines.
Conduct load testing to ensure the crane can lift safely.
Operators perform functional tests for movement, lifting, and braking.
Safety systems such as limit switches, alarms, and emergency stops are verified.
8. Ready for Operation
Once all tests are passed, the crane is cleared for lifting operations. Regular maintenance and safety checks are recommended before and after use.
Here are some relevant hashtags for your crawler crane assembly post:
General Hashtags:
#CrawlerCrane #CraneAssembly #HeavyEquipment #ConstructionLife #CraneOperator #ConstructionMachinery #CraneLifting
Industry-Specific Hashtags:
#HeavyLifting #LiftingEquipment #ConstructionEngineering #CraneSetup #Rigging #CraneInstallation
Safety & Maintenance Hashtags:
#SafetyFirst #ConstructionSafety #CraneMaintenance #OSHA #WorkSiteSafety

Чтобы скачать видео "Assembling a Crawler Crane" передвинте ползунок вправо
- Комментарии
Комментарии ФБ